The main span of the bridge was replaced following a bridge strike.
The new 28 metre bridge section was fabricated at our works, and transported to site on a special rear wheel steering trailer, to enable it to negotiate corners.
The lifting operation took place at night to minimise traffic disruption, and lasted just 7 hours.